- Visit our Location:
Larecoweg no.28 – km 37 ½, Saramacca, Suriname S.A.
We will be glad to assist you
Larecoweg no.28 – km 37 ½, Saramacca, Suriname S.A.
We will be glad to assist you
Give us a call
Give us a call
The construction process for API 12B bolted tanks typically begins with the preparation of the tank foundation. The foundation must be level and capable of supporting the weight of the tank and its contents. Once the foundation is prepared, the tank panels are delivered to the site and assembled.
The panels are typically made of steel and are coated with a corrosion-resistant material to protect them from the elements. The panels are connected to each other using a system of bolts and gaskets. This method of construction allows for the tanks to be easily disassembled and reassembled if needed.
Once the panels are assembled, the roof of the tank is installed. The roof is typically made of steel and may be a dome, cone, or a floating roof. The roof is designed to keep rain and other environmental factors from entering the tank.
After the roof is installed, the tank is ready for use. The tank is typically filled with the product it is designed to store, such as oil or gas. The tank is then monitored and maintained to ensure that it remains in good condition.
In addition to oil and gas, these tanks can also be used to store chemicals commonly used in the offshore industry such as drilling muds, completion fluids, produced water, and other chemical additives. These tanks are designed to meet industry standards.
Overall, the construction of API 12B bolted tanks is a relatively straightforward process that is quick and efficient. This type of tank is a cost-effective and durable solution for the storage of various liquids and gases.
Our company has the expertise and experience to install these tanks. We work closely with our clients to ensure that the tanks we provide meet their specific needs and comply with industry standards.
Our inventory includes 20 pieces of 12 Metric ton hydraulic jacks, which are specifically designed for tank erection. With this equipment on hand, we have the capability to handle even the largest and most complex tank projects with ease. This ensures a smooth and efficient tank construction process for our clients. Whether you need a tank for storing chemicals in the offshore industry or for municipal use, our team has the experience and equipment to get the job done right.