- Visit our Location:
Larecoweg no.28 – km 37 ½, Saramacca, Suriname S.A.
We will be glad to assist you
Larecoweg no.28 – km 37 ½, Saramacca, Suriname S.A.
We will be glad to assist you
Give us a call
Give us a call
As an integral part of the tank building process, we also provide services for grit blasting, painting, hydro testing till connection to other facilities such as pumps, manifolds, pipelines or any such other pre-assembled or pre-installed units.
Currently, we have all necessary equipment, tools and others instruments, including certified and experience welders, pipefitters, painters and grit blasters. Our welding jobs are checked and assessed against international standards by an international certified Welding Inspector to guarantee the best quality to our customers. To further expand our services to meet our Customers increasing demands, we have bought own welding “Robot”. This machine should enable us to further improve the quality, effectivity and efficiency of this service to our customers.
For every project we provide a detailed agreed upon project execution plan including a time schedule for our Customers to monitor timely completion of the various activities till hand-over of the project. We deliver our projects with a hand-over document, including all project planning and project execution details and Quality Control/Quality Assurances.
In September 2015 we finished a tank construction project at the TA-58 plant of Staatsolie Maatschappij Suriname N.V. at Saramacca. Our scope was to fabricate 3 of the 5 ea. 500 bbl. collection / storage carbon steel tanks; 3 tanks were completed by another contractor. STP provided the manpower, equipment and materials for the 3 ea. 500 bbl. Carbon steel tanks.
In February 2016, we demolished and constructed a 3020 bbl. carbon steel storage tank at the Josi plant of Staatsolie Maatschappij Suriname N.V. at Saramacca. The existing 3020 bbl. carbon steel storage tank was heavily corroded and needed to be replaced on the same tank foundation, meaning the corroded tank needed to be demolished first.
This tank was demolished by means of the gouging method, where after the construction of the new tank was started.
In December 2017 we demolished and constructed 5000 bbl. Collection Tank #1. The existing 5000 bbl. carbon steel storage tank was replaced with a new 5000 bbl. carbon steel storage tank on the same location. The tank was demolished by means of the gouging, where after the new tank was built by our certified welders under supervision of our experienced project manager and Certified Welding Inspector.
3ea 2000 BBL Tank
10760 BBL Tank
10760 BBL Tank
Automatic Girth Welding
LT-7 Tractor Floor welding
LT-7 Tractor